Your new-build electrical checklist, before you sign off
The electrical choices to make early on a Caboolture West new build are how many power points you'll really use, where the switches and lights go, how big the switchboard is, and what you want ready for an EV charger, solar, a battery and data cabling.
- Decide before first fix, when the wiring goes into the walls and ceilings.
- Plan for later with spare board space and spare conduit, which cost little now.
- Get every change in writing from your builder.
If you're building a family home in a growth area and juggling work, kids and a builder who wants answers by Friday, the electrical appointment can feel like one more form to fill in. It's actually one of the few chances to shape how your home works for the next twenty years. Here's what's worth thinking about before you sign off.
Why your electrical appointment matters more than you think
Most builders will book you in for an "electrical appointment" sometime before the framing goes up. It's often a quick meeting with a plan on a table, and it's easy to rush through.
Walking through each room before first fix
First fix is when the wiring goes into the walls and ceilings, before the plaster. It's the point of no easy return.
Before it happens, walk through your plans room by room, and imagine living in each space. Where does the bed go, and where will you charge your phone? Where's the sofa, and where does the lamp plug in? Where will the desk go if someone works from home?
How many power points you will really use
Builders' standard packages tend to include a basic number of points, and most families use more than that.
Think about your real life. Kitchens and sculleries are the big one. Installers often say to go generous in these spaces, because the last thing you want is extension cords everywhere. Think about the bench, the island, the coffee machine, the air fryer and the charging spot.
Here's a quick checklist worth running through:
- Double points rather than singles, where you can
- Points on both sides of the bed
- Extra points in the living room for TV, console and lamps
- Outdoor points on the patio, front porch and near the garage
- Garage points for tools, a second fridge or a workbench
- A spare point or two where you might add something later
It's cheap to add them now. It's annoying to add them later.
Lighting plan, switch positions and dimming
Good lighting makes a home feel finished. Bad lighting makes a new home feel off.
Think about layers: general light, task light and mood light.
Kitchen
Bright light over the bench.
Living area
Dimmers and lamps for a softer feel.
Bedrooms
Bedside switches are a luxury you'll love.
Switchboard size and room for future circuits
Your switchboard is the heart of the house. It's where the power comes in and gets split into circuits.
Builders often fit a board that meets the minimum. That's fine on day one, but it can leave you with no room if you add an EV charger, a heat pump, a pool or a second air conditioner later.
| Future addition | What it needs from the board |
|---|---|
| EV charger | Its own circuit and breaker, plus a cable path to the garage or carport |
| Solar and battery | Space for a solar circuit, and a suitable spot for the inverter and battery |
| Heat pump hot water | A dedicated circuit |
| Second air conditioner | Another dedicated circuit |
| Pool or shed | Its own supply, and a spare conduit run to the area |
Ask for a board with spare space, and ask what loads it's been designed for. Government guidance for electrifying homes recommends including spare capacity, meaning extra slots, whenever a board is installed or upgraded. Leaving room at construction stage is much easier than finding it later.
Safety switches in new Queensland homes
Safety switches have been compulsory on power point circuits in new Queensland homes since 1992. For homes built since 2000, they're compulsory on lighting circuits too. So your board will have them. Ask how many circuits each one covers, because more coverage means fewer things shut down at once when one trips.
Pre-wiring for an EV charger
Even if you don't have an electric car yet, there's a good chance you will before the mortgage is paid off.
Pre-wiring for a charger means running a suitable circuit to the garage or carport, and leaving room in the switchboard for it. Builders and designers describe this as cheap during the build and painful afterwards. A load check during design, which looks at how much power the house will draw overall, helps work out what size charger suits.
A charger takes a big slice of a typical home's supply
One builder's figures: a 7 kW charger running flat out draws about 32 A, around half of a typical suburban home's 63 A supply.
If you're not installing a charger straight away, you can still plan for one. Tell us where the car will park, and we'll make sure the cable path and board space are sorted. When you're ready, installation is simple. Our EV charger work is something our customers often mention in their reviews.
Solar and battery readiness
What we do, and what we don't
Solar isn't one of our services, so we won't install panels. But we can make your house ready for them, and that's where a lot of new builds fall short.
Readiness means thinking about where the inverter will go, how cables will run from the roof, and whether the board can accept a solar circuit. If you might add a battery, a wall space with a suitable backing and a clear path for conduit makes the installation much easier. Some builders suggest adding timber backing and a non-combustible barrier at frame stage, before the walls are lined.
- Decide where the inverter will go
- Plan the cable route from the roof
- Check the board can accept a solar circuit
- Leave a wall space with suitable backing for a battery
- Run a spare conduit from the roof space to the switchboard
Even a spare conduit from the roof space to the switchboard is a small step that saves you a big job later. If you choose a solar installer down the track, they'll thank you for it.
Data points, Wi-Fi access points and the NBN
Plan your data before the walls close. A lot of new homes have a single data point somewhere near the front door, and that's not enough for how most families live.
Run data cable to each main room, plus a few ceiling points for Wi-Fi access points. A central spot for the modem and network gear makes it all neater. And ask where your NBN connection will land, because that decides where the network cabinet should go.
Here's a simple three-step version of how we'd handle it:
Step 1: Plan
Mark where every data point and access point will go on the plan.
Step 2: Cable
Run the cables at frame stage, home-run back to one central spot.
Step 3: Connect
Connect, test and label everything once the house is lined.
We hold an Open Cablers Registration (#048361), so we can handle the data as well as the power.
Air conditioning, hot water and cooking loads
These are the big electricity users in most homes, and they all want their own circuits.
Air conditioning
Ducted or split system, and how many zones?
Hot water
Electric, heat pump or something else, and where will it sit?
Cooking
Electric or gas? An electric oven and cooktop need substantial circuits.
The wiring has to be planned around these. If you're not sure what you'll choose, tell us the options you're considering, and we'll make sure the supply can handle the lot. Running out of capacity is a lot more annoying than having a bit extra.
Outdoor power, lighting and pool or shed supply
The outdoors is easy to forget in a new build, but it's where a lot of family time happens.
Think about outdoor lighting for the patio, the path and the backyard. Add outdoor power points, so you're not dragging a cord through the house. If you might build a pool, a shed or a granny flat later, leave a spare conduit and board space for them.
Pools and sheds need their own supply, and they have strict safety rules about electricity near water. It's much easier to plan the cable path before the landscaping goes in than to dig up a finished yard.
Smoke alarms, safety switches and compliance on handover
At handover, make sure the safety basics are done.
Smoke alarms in a new Queensland home
New homes must have interconnected photoelectric smoke alarms in every bedroom, in hallways that connect bedrooms and on each level. Under the Building Regulation, new dwellings need them hard-wired and interconnected, so when one goes off, they all go off.
- Smoke alarms interconnected, photoelectric and in every bedroom, connecting hallway and level
- Safety switches covering your power point circuits
- A compliance certificate from your electrician for the electrical work
- The switchboard labelled clearly, so you know which breaker controls what
- Safety switches tested with the test button
- A walk-through of all the lights, switches and points before you accept the keys
And keep your paperwork somewhere safe, because future buyers like to see it.
Talking to your builder and getting changes in writing
Builders are busy, and verbal agreements get lost. Get anything you decide in writing.
Ask for your electrical plan as a document, mark up any changes, and ask for the variation to be confirmed in writing before work happens. Confirm who's doing the work, since some builders use their own electricians and some let you bring yours. If your builder allows it, ask us to take a look at the plan. A second pair of eyes often finds things.
We're a family-owned team in Bellmere, and we know the Caboolture West area well. We hold Electrical Contractor Licence #90211, back our work with a 5-year workmanship guarantee, and we're on call 24/7 for emergencies. Send us your plans or a few photos, and we'll put together an upfront, fixed written quote for the electrical work, usually within 24 hours for standard jobs.
Caboolture West new build electrical: questions we get asked most
When do I need to decide on my electrical layout?
Before first fix, when the wiring goes into the walls and ceilings. After that, changes get harder and dearer, so walk through your plans room by room at your electrical appointment.
How many power points should I ask for?
More than the standard package, especially in the kitchen and scullery. Ask for double points, points on both sides of the bed, outdoor and garage points, and a spare or two for later.
Should I pre-wire for an EV charger if I don't have an EV?
It's worth it. Running a circuit to the garage and leaving room in the board is cheap during the build and painful afterwards.
Do you install solar?
No, solar isn't one of our services. We can make your house ready for it, with board space, a conduit path from the roof and a suitable spot for the inverter and battery.
Will my new home have safety switches?
Yes. They've been compulsory on power point circuits in new Queensland homes since 1992, and on lighting circuits too for homes built since 2000. Ask how many circuits each one covers.
Can I use my own electrician instead of the builder's?
Some builders use their own electricians and some let you bring yours. Confirm it with your builder, and get it in writing.
Building at Caboolture West?
Send us your plans or a few photos, and we'll put together an upfront, fixed written quote for the electrical work, usually within 24 hours for standard jobs.
Send us your plansSources: Queensland Government: Caboolture West; Electrical Safety Office Qld: FAQs; QFD: Smoke alarms; WorkSafe Qld: Installing smoke alarms; SolarQuotes: A builder's guide to an all-electric new home; ACT Government: Electrical upgrades to support electrification; Energy Matters: Planning for a future EV charger and battery. Requirements change, so confirm them with your builder and electrician.
